Featured

    Featured Posts

If the clock frequency is 5MHz, how much time is required to execute an instruction of 18 T states ?



If the clock frequency is 5MHz, how much time is required to execute an instruction of 18 T states ?

Ans.
          Given data :
             Clock frequency = 5MHz
              T-State  = 18
              Time period 1 clock cycle = 1/5 = 0.2µS
               So, Time required = 18*0.2µS = 3.6µS.


2 comments

TreasureBox is operated by a group of young, passionate, and ambitious people that are working diligently towards the same goal - make your every dollar count, as we believe you deserve something better.
laptop table
shoe storage nz
outdoor furniture covers nz

Reply

Great Article android based projects

Java Training in Chennai Project Center in Chennai Java Training in Chennai projects for cse The Angular Training covers a wide range of topics including Components, Angular Directives, Angular Services, Pipes, security fundamentals, Routing, and Angular programmability. The new Angular TRaining will lay the foundation you need to specialise in Single Page Application developer. Angular Training Project Centers in Chennai

Reply

Post a Comment

www.CodeNirvana.in

www.posthatke.com. Powered by Blogger.
Copyright © www.posthatke.com | Blogger Templates | Designed By posthatke.com